Main
Feedback
Map
Русский
     
Main
 
 
 
Railway construction Road construction Hydraulic engineering Own production

The SK MOST group of companies encompasses 15 bridge construction branches and 7 tunnel divisions.

Starting its operation in 1991 with the major overhaul of sites on the Trans-Baikal Railway, today the company performs work in construction and reconstruction of rail and car roads, large and small bridges, tunnels, ports and berths, hydraulic structures, runways, residential and office buildings.

The ongoing projects of the “MOST” Construction Company are:

  • construction of a joint (motor and rail) road from Adler to Krasnaya Polyana for the forthcoming Olympics-2014 in Sochi;
  • construction of a bridge crossing to the Russkiy Island over the Eastern Bosporus Strait for the forthcoming summit of the Asian-Pacific Economic Council 2012 in Vladivostok.

full text

SK MOST group today

  • Network of Production Bases
  • Own River Navigation Fleet
  • Over 2000 Construction Machines and Units
  • Over 150 Mobile Sites
  • Own Design Engineering Division
  • ISO 9001:2008 Compliant

Video

08.06.2010 — Сombined road Adler – Krasnaya Polyana is 25% complete

Сombined road Adler – Krasnaya Polyana is 25% complete by beginning of August.


Страницы: 1 | 2 | 3 | 4 | 5 | 6 | 7
Архив по годам: 2009; 2010;
Moscow, Russia
www.rusmost.ru
www.skmost2014.ru
E-mail: usk@skmost.ru
 
Сopyright © 2007 SK Most. All rights reserved.  
Developed by ArtDeneb