Main
Feedback
Map
Ðóññêèé
     
Main

Video


08.06.2010 — Ñombined road Adler – Krasnaya Polyana is 25% complete

Ñombined road Adler – Krasnaya Polyana is 25% complete by beginning of August.


Ñòðàíèöû: 1 | 2 | 3 | 4 | 5 | 6 | 7
Àðõèâ ïî ãîäàì: 2009; 2010;
 
 
Overpass bridge on the Baikal highway
Road construction / Overpass bridge on the Baikal highway

Overpass bridge on the Baikal highway

The overpass bridge over the East-Siberian Railway is located at the 74th kilometer PK 18 + 20 of the M-55 Baikal highway connecting Irkutsk, Ulan-Ude and Chita, and at the 5,262nd kilometer PK8 of the Glubokaya – Andrianovskaya railway section.

Work started: August 2006; To be completed: October 2008.

Overpass bridge configuration: 24.0+33.0+24.0 m, length – 89.5 m. Road width: 12.3 m with sidewalks 2õ0.75 m.

The overpass bridge rests on arched abutments on top of a monolith foundation. Support stands are rectangular, 0.8 x 0.5 m and 7.0 and 6.0 m long. Interim supports are poles on foundations made of the assembled blocks. Support stands have a diameter of 0.8 meters and 12 meters long.

The span structures of 24 and 33 meters in length, made of reinforced concrete H-beams with pre-stressed rods.

The road has a two-layer asphalt and concrete pavement 60 and 55 mm thick, respectively. To prolong the life of the pavement and raise its resistance to cyclical temperature impacts, the asphalt reinforcement with Glasstex P100 geosynthetical materials is used.

Construction work is carried out near a functioning railway. Installation of the beam decking L = 33.0 m were assembled during 7 “windows” with the train traffic interruption and the fully disassembled contact network.



  • Bridge Crossing to the Russky Island Across the Eastern Bosporus Strait in Vladivostok
  • Sheremetyevo overpass in Moscow
  • Highway bridge in St. Petersburg
  • Road interchange crossing in Tyumen
  • Bypass around Chernyshevskoye village
  • Bridge across the Sura River and railroad in Penza
  • Bridge across the Staraya and Novaya Pregolya Rivers
  • Overpass bridge on the Baikal highway
  • Overpass bridge in Korolev
  • Bridges between 483rd and 539th km of the Amur highway
  • Bridges between the 539th and 596th km of the Amur highway
  • Bridges between the 1143rd and 1183rd km of the Amur highway
  • Vehicle Access from the AMUR motorway to the Town of Kudecha
  • Overbridge in Ekaterinoslavka village (Amur Region)
  • Reconstruction of the M-60 Ussuri federal highway from Vladivostok to Khabarovsk
  • Moscow, Russia
    www.rusmost.ru
    www.skmost2014.ru
    E-mail: usk@skmost.ru
     
    Ñopyright © 2007 SK Most. All rights reserved.  
    Developed by ArtDeneb