Bridges in 639th - 664th-km Section of M-60 “Ussury” Motorway
Road construction / Bridges in 639th - 664th-km Section of M-60 “Ussury” Motorway
Reconstruction of M-60 Federal Route “Ussury” Vladivostok - Khabarovsk at the 639th - 664th-km Section
The motorway section that is 25.3-km long is part of a bypass around the city of Ussuriysk.
The work started in 2009 and is to be completed in June 2011.
The SK Most-Vostok LLC is building three installations:
Overpass that is 69.94-m long at No.1 Interchange, Stake 8+42 (design: 18.145+33.00+18.145 m);
Overpass that is 54.6-m long over the railway, Stake 27+88 (design: 3x18 m);
Bridge that is 144.85-m long over the Rakovka River, Stake 48+54 (design: 8x18 m).
The bridge and overpass projects include the following operations:
Putting in place drilled pile footing piers;
Installation of reinforced concrete span girders;
Construction of the roadway and the bridge embankment interfaces;
Installation of railing and roadside guard rails;
Roadway and sidewalk asphalt concrete paving; bridge painting;
Building stairways on the motorway embankment slopes;
Approach slope filling;
Installation of bridge lighting equipment.
Construction equipment on the project sites is from the leading manufacturers: Bauer drilling rig; Kato NK-500 lifting crane; Kato MR-700 lifting crane; 80-ton Grow lifting crane; TNS-30 drilling rig; SB-143 modular concrete mixing plant.