Projects in 747th - 750th-km Section of M-60 “Ussury” Motorway
Road construction / Projects in 747th - 750th-km Section of M-60 “Ussury” Motorway
Reconstruction of M-60 Federal Route “Ussury” Vladivostok - Khabarovsk at the 747th - 750th-km Section
The reconstruction project is part of the preparations for the APEC-2012 Summit in Vladivostok. Customer: Federal State Institution Directorate of the Federal Road Agency for Construction of Road Facilities in Far Eastern Federal District (FGU DSD) “Vladivostok,” General Contractor: OJSC Primavtodor, Subcontractor: OJSC USK MOST.
The work started in December 2009 and is to be completed in December 2011.
Under the contract, the OJSC USK MOST performs the following work:
Roadway reconstruction and widening;
Construction of 6 overhead crossings;
Building an interchange at Vesennya Station (a total length of 498.84 m; design: 15x33);
Building temporary asphalt-paved detour roads in the area of the Peschanka, Bogataya, and Chernaya rivers;
Building new bridges over the rivers Peschanka (overall bridge crossing length of 36.6 m), Bogataya (overall bridge crossing length of 105.7 m), Saperka (overall bridge crossing length of 33.5 m), and Chernaya (overall bridge crossing length of 55.33 m)
Bridge over the Peschanka River
Bridge over the Saperka River
Bridge over the Chernaya Rechka River
Bridge over the Bogataya River
Building No.2 Viaduct at Vesennya Station Interchange