|
Road construction / Road interchange crossing in Tyumen Road Interchange crossing in Tyumen ( Morris Torrez St.)
Work started: June 2005; To be completed: September 2008.
The total road interchange length is 429.55 m. A Number of lanes is from 6 to 8.
The road interchange crossing consists of seven solid-metal span structures of the central overpass and seven solid pre-stressed reinforced concrete structures at entrances and exits from the highway, which connects Morris Torrez and Mira Streets.
The span structures of the central highway are solid with an orthotropic deck. In the cross section: 6 to 8 flush decks (for each lane) interconnected by transverse ties and crossbeams.
The span structures of exits (entrances) are solid, ribbed, pre-stressed.
The intermediate supports of two types: solid single-pole (without crossbeams) and three-pole supports. Abutments are solid, earth-covered, on a foundation of shell piles 0.6 m in diameter.
The welded span structures of the central highway are assembled by cranes with the help of temporary supports. Reinforced concrete structures of exits (entrances) are assembled on metal pole trestles developed by the MOST Construction Company.
The construction is being carried out in a restrictive urban setting.
Bridge Crossing to the Russky Island Across the Eastern Bosporus Strait in VladivostokSheremetyevo overpass in MoscowHighway bridge in St. Petersburg Road interchange crossing in Tyumen Bypass around Chernyshevskoye villageBridge across the Sura River and railroad in Penza Bridge across the Staraya and Novaya Pregolya RiversOverpass bridge on the Baikal highway Overpass bridge in Korolev Bridges between 483rd and 539th km of the Amur highwayBridges between the 539th and 596th km of the Amur highwayBridges between the 1143rd and 1183rd km of the Amur highwayVehicle Access from the AMUR motorway to the Town of Kudecha Overbridge in Ekaterinoslavka village (Amur Region)Reconstruction of the M-60 Ussuri federal highway from Vladivostok to Khabarovsk
|