Amour River Bank Stabilization
Hydraulic engineering / Amour River Bank Stabilization

Amour River Bank Stabilization and Embankment Reconstruction in the city of Blagoveshchensk

The work started in the 1st quarter of 2007 and was completed in the 3rd quarter of 2008.

The section length is 341 m.

The following work was completed per design:

The following work was completed per design:

  • Putting in place a bored pile footing;
  • Erecting cast-in-place grillage;
  • Installing heavy concrete blocks;
  • Erecting a cast-in-place reinforced concrete superstructure; putting in place and painting hand railing; installing fender posts and fender bumps;
  • Placing 20-cm thick cement-based concrete pavement.
  • Amour River Bank Stabilization and Embankment Reconstruction Project was implemented as part of a dedicated federal program "Economic and Social Development of the Far East and Trans-Baikal Region through the Year 2013."

    The project was aimed at restoring Amour River bank consolidation structures that were destroyed as a result of two floods. The banks have been consolidated at that place before in 1960's - 1970's.



       


    View Hydraulic engineering in a larger map

  • Grain terminal in Astrakhan
  • Cargo Handling Terminal on Russky Island in Vladivostok
  • Amour River Bank Stabilization
  • Astrakhan Commercial Seaport, Terminal No.2
  • Seaport Facilities Near the Town of Sabetta
  • Storm Sewage Treatment Facilities in Togliatti
  • Moscow, Russia
    www.rusmost.ru
    E-mail: usk@skmost.ru
     
    Сopyright © 2007 SK Most. All rights reserved.  
    Developed by ArtDeneb