Grain terminal in Astrakhan
Hydraulic engineering / Grain terminal in Astrakhan

Construction of a berth and grain terminal on the territory of Volga Port
Astrakhan

Work started: 2002; work completed: 2003.

Scope of work in constructing a grain terminal:

  • sinking of 530-mm piles filled with cast-in-place concrete Ц 130 piles;
  • construction of a full complex for a grain terminal (including 18-meter silo towers for a grain storage with foreign-made equipment Ц two silo towers);
  • construction of a ramp for loading grain onto vessels Ц 120 r. m.;
  • installation and assembly of equipment for grain transshipment from the railway transport onto the vessels Ц 1 complex;

  • construction of a 2-story administrative complex (AHF brick building);
  • performance of service lines for water supply networks, drainage, sewage treatment, power supply, and communication.
  • The Scope of work for berth construction:

    • dredging of the river floor along the berth wall Ц 1420 m3;
    • installation of solid ferroconcrete cross beams Ц 620 m3;
    • installation of solid ferroconcrete anchor slabs Ц 1800 m3;
    • installation of anchor ties Ц 30 tons;
    • sand backfilling of cavities behind the berth wall Ц 2400 m3.


  • Grain terminal in Astrakhan
  • Cargo Handling Terminal on Russky Island in Vladivostok
  • Amour River Bank Stabilization
  • Astrakhan Commercial Seaport, Terminal No.2
  • Seaport Facilities Near the Town of Sabetta
  • Storm Sewage Treatment Facilities in Togliatti
  • Moscow, Russia
    www.rusmost.ru
    E-mail: usk@skmost.ru
     
    —opyright © 2007 SK Most. All rights reserved.  
    Developed by ArtDeneb