The film narrates about SK MOST technological concepts and capabilities, the most important and interesting projects such as a stay cable bridge to the Russky Island in Vladivostok, Adler - "Alpika-Service" Mountain Resort combined motorway and railway in Sochi, combined tunnel under the Lena River in Yakutsk, Kuznetsovsky tunnel in the Far East, and also presents the company’s major social policy programs.


Страницы: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8
Архив по годам: 2009; 2010; 2011;
 
 
Boguchansk Hydroelectric Power Plant
Hydraulic engineering / Boguchansk Hydroelectric Power Plant

Rock-fill embankment of Boguchansk HPP

Krasnoyarsk Territory, Boguchansk district

In 2006, the primary and additional works putting in place 6,503.84 m3 of cast hydrotechnical asphalt concrete into the impervious diaphragm were completed. The asphalt concrete diaphragm is the primary waterproof element of the rock-fill embankment of Boguchansk HPP built in such harsh climatic conditions for the first time.

A complex of earth and rock work in building a rock-fill dam in the volume of 1,154,339 m3, inspection shafts made of 71.9 m3 of preassembled ferroconcrete, and concrete facing of the right-bank abutment of 454.2 m3 had also been performed.

A powerful concrete placing complex, including a concrete plant, crawler cranes, and mobile formwork, had been set up on the site.



  • Grain terminal in Astrakhan
  • Boguchansk Hydroelectric Power Plant
  • Sayano-Shushenskaya Hydropower Plant
  • Zagorsk Hydroelectric Pumped Storage Power Plant-2
  • Cargo Handling Terminal on Russky Island in Vladivostok
  • Amour River Bank Stabilization
  • Astrakhan Commercial Seaport, Terminal No.2
  • Moscow, Russia
    www.rusmost.ru
    www.skmost2014.ru
    E-mail: usk@skmost.ru
     
    Сopyright © 2007 SK Most. All rights reserved.  
    Developed by ArtDeneb