Subway

Construction Project on Taganskaya-Krasnopresnenskaya Moscow Subway Line

Taganskaya - Krasnopresnenskaya Moscow Subway Line section between Vykhino Station and Kotelniki Station is under construction within the subway engineering area in the heavily developed urban environment. The section length is 6,850 meters.

Construction of Moscow Subway Kozhukhovskaya Line

Construction project of a new Moscow Subway Kozhukhovskaya line is implemented in two phases. As part of Phase I, the companies of the SK MOST Group are building a section of the Kozhukhovskaya line between the Nekrasovka Station and the exit chamber downstream the Kossino Station including a tunnel connecting to the Tagansko-Krasnopresnenskaya line and a branch line to the Rudnevo Electric Depot.

The total length of the section is 8.25 kilometers; the service length is 6.84 kilometers.

The work started in June 2013 and is to be completed in December 2015.

The new branch is under construction in a heavily developed urban area with a dense network of underground utility lines. The stage tunnels are shield-driven using four tunnel-boring machines with the cutting diameter of 6 meters, which were used previously for building the Vykhino - Kotelniki section of the Tagansko-Krasnopresnenskaya line.

The Kozhukhovskaya line will connect the center of Moscow with the east-side areas of the capital and with the near suburbs of Moscow.