Zhulebino - Kotelniki Section in Moscow
Subway / Zhulebino - Kotelniki Section in Moscow

Construction of Moscow Subway Zhulebino — Kotelniki Section of Taganskaya - Krasnopresnenskaya Line

 

The work started in October 2012 and is to be completed in December 2013.

The length of each of the left-hand and right-hand tunnels between Zhulebino and Kotelniki stations is 780 meters.

Kotelniki station will be 430-meter long and the turnabout sidings will also be 430-meter long.

Scope of Operations:
- Construction of two tunnels between Zhulebino and Kotelniki stations;
- Building Kotelniki Station (pit excavation, erection of the major reinforced concrete structures, civil work inside the station, backfilling, and area improvement);
- Final civil work in the station facilities and in the interstation tunnels.

The interstation tunnels between Zhulebino and Kotelniki stations are built by using tunneling systems that leave behind the finished reinforced concrete lining. The station facilities are built in an open pit simultaneously with the shield driving of the interstation tunnels.

Herrenknecht-736 Tunnel Boring Machine will be used for driving the interstation tunnels in the direction from Zhulebino Station to Kotelniki Station.



  • Vykhino — Lermontovsky Prospekt Section in Moscow
  • Lermontovsky Prospekt — Zhulebino Section in Moscow
  • Zhulebino - Kotelniki Section in Moscow
  • Kossino-Ukhtomskaya — Nekrasovka Section in Moscow
  • Kossino-Ukhtomskaya - Saltykovskaya Street - Kossino Section of the Kozhukhovskaya Line
  • Dzerzhinskaya Line of the Novosibirsk Subway
  • Moscow, Russia
    www.rusmost.ru
    E-mail: usk@skmost.ru
     
    Сopyright © 2007 SK Most. All rights reserved.  
    Developed by ArtDeneb