Kuznetsovsky railway tunnel
Tunnel construction / Kuznetsovsky railway tunnel

Kuznetsovsky railway tunnel

Construction of the new Kuznetsovsky tunnel on the Komsomolsk-on-Amur – Sovetskaya Gavan section of the Far Eastern railway

Length of the tunnel – 3890 m.

Scope of work: construction of a new tunnel and a transport and drainage gallery parallel to the designed single-track tunnel. Tunnel excavation is performed by means of a LOVAT RME-375 SE, D=9.5 m mechanized shield complex.

Completion of construction – 2013.



   



  • Kuznetsovsky railway tunnel
  • Krolsky railway tunnel
  • Mansky railway tunnel
  • Maly Novorossiisky railway tunnel
  • Moscow, Russia
    www.rusmost.ru
    www.skmost2014.ru
    E-mail: usk@skmost.ru
     
    Сopyright © 2007 SK Most. All rights reserved.  
    Developed by ArtDeneb