Main
Feedback
Map
Русский
     
Main

Video



Страницы: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10
Архив по годам: 2009; 2010; 2011; 2012; 2015;
 
 
Tunnel at the 86th kilometer of Transkam road
Tunnel construction / Tunnel at the 86th kilometer of Transkam road

Tunnel at the 86th Kilometer of Alagir – Nizhni Zaramag Transkam road.

Start of construction – 2008, completion of construction – June 10, 2012.

Construction of a Tunnel at the 86th Kilometer of Alagir – Nizhni Zaramag Transkam road.

The tunnel length is 310 m.

The scope of work includes erection of a 63-meter long avalanche protection gallery on the southern entry side and retaining wall construction. The tunnel was driven simultaneously from the northern and southern entries by drilling and blasting using Atlas Copco Boomer XE3 C Face Drilling Rig. The tunnel cap was connected on September 1, 2011 and the bottom part of the tunnel was completed on September 30, 2011.




  • Kuznetsovsky railway tunnel
  • Krolsky railway tunnel
  • Mansky railway tunnel
  • Maly Novorossiisky railway tunnel
  • Bolshoy Novorossiysky Tunnel
  • Tunnel System No.1 on Adler - "Alpika-Service" Route in Sochi
  • Railway Tunnel No.2 on Adler - "Alpika-Service" Route in Sochi
  • Tunnel System No.3 on Adler - "Alpika-Service" Route in Sochi
  • Railway Tunnel No. 4 on Adler - "Alpika-Service" Route in Sochi
  • Tunnel System No. 5 on Adler - "Alpika-Service" Route in Sochi
  • Railway Tunnel No. 6 on Adler - "Alpika-Service" Route in Sochi
  • Tunnel at the 86th kilometer of Transkam road
  • Rocksky Motorway Tunnel
  • Obluchensky Railway Tunnel
  • Railway Tunnel Number One on the Northern Caucasus Railway
  • Tomusinsky Railway Tunnel
  • Korshunovsky Railway Tunnel
  • Kiparisovsky Railway Tunnel
  • Baikal Railway Tunnel
  • Second Dzhebsky Railway Tunnel
  • Moscow, Russia
    www.rusmost.ru
    E-mail: usk@skmost.ru
     
    Сopyright © 2007 SK Most. All rights reserved.  
    Developed by ArtDeneb