About us
Business directions of operations
Our projects
Railway construction
Tunnel construction
Road construction
Hydraulic engineering
Civil engineering
Airports
Equipment
Social policy
Press Center
Contacts
Video
08.06.2010 — Сombined road Adler – Krasnaya Polyana is 25% complete
Сombined road Adler – Krasnaya Polyana is 25% complete by beginning of August.
Страницы:
1
|
2
|
3
|
4
|
5
|
6
|
7
Архив по годам:
2009
;
2010
;
Railway construction
Combined motor and rail road Adler – Krasnaya Polyana
Bridge across the Zeya River
Bridge across the Buzan River
Bridge across the Volga River (Ulyanovsk)
Bridge across the Kama River
Bridge across the Moscow River
Bridge across the Vyatka River
Bridge across the Unzha River
Bridge across the Volga River (Zelenodolsk)
Bridge across the Don River
Bridge across the Ob River
Bridge across the Prokhladnaya River
Viaduct at the Agryz – Druzhynino
Railway Bridge over the Shaldura River
Construction of the second track
Small artificial structures
Bridge across the Oka River
Moscow, Russia
www.rusmost.ru
www.skmost2014.ru
E-mail:
usk@skmost.ru
Сopyright © 2007 SK Most. All rights reserved.
Developed by
ArtDeneb