Bridge over the Nerl River
Railway construction / Bridge over the Nerl River

Railway Bridge over the Nerl River

Construction of two single-track bridges at the 202nd km of the Moscow – Nizhny Novgorod section of the Gorky Railway (Vladimir Region).

Work started in August 2009; work completed:
  - 2011 - the first and second phases of construction,
  - 2012 - the third phase of construction,
  - 2013 - the fourth phase of construction.

The new bridges were put in service in November 2011.

Design: 27+88+27 m. The total length of the installation is 155.79 meters.

Scope of Operations:

  • Construction of two single-track bridges on common pillars (Phase I, 2009-2011),
  • Dismantling the old bridge; building water treatment and bank shoring facilities (on the left river bank); building office and service facilities: paramilitary guard buildings); building a pumping station and transformer substation; upgrading the service/amenities building; building a road from M7 Federal Highway to the Church of the Veil on the Nerl (Phase II, 2009-2011),
  • Installation of lighting and surveillance systems; construction of water treatment and bank shoring facilities (on the right river bank); building a berth; building office spaces; construction of two Bogolyubovo station platforms at a new location because of tracks rerouting; building a service driveway under the railway bridge; implementing a number of nature conservation actions in view of removal of an old bitumen burial site left after the World War II; and cleaning up the area bordering the Bogolyubovo Meadow, which is a nature reserve (Phase III, 2009-2012);
  • Track installation over a length of 1.5 km (Phase IV, 2009-2013).

The work was done as part of the introduction of high-speed traffic in the Moscow - Nizhny Novgorod section.

General Contractor is OJSC STROY-TREST.



  • Bridge across the Zeya River
  • Bridge across the Buzan River
  • Bridge across the Volga River (Ulyanovsk)
  • Bridge across the Kama River
  • Bridge across the Moscow River
  • Bridge across the Vyatka River
  • Bridge across the Unzha River
  • Bridge across the Volga River (Zelenodolsk)
  • Bridge across the Don River
  • Bridge across the Ob River
  • Bridge across the Prokhladnaya River
  • Viaduct over Ryabinovy Log Canyon
  • Railway Bridge over the Shaldura River
  • Construction of the second track
  • Small artificial structures
  • Bridge over the Oka River (city of Murom)
  • Bridge over the Sheksna River
  • Bridge over the Volga River (city of Astrakhan)
  • Bridge over the Samara River
  • Bridge over the Syzranka River
  • Bridge over the Volga River (city of Syzran)
  • Bridge over the Chuna River
  • Railway Bridge over the Tysia River
  • Bridge over the Ufa River
  • Bridge over the Tura River
  • Bridge over the Rodnikovaya River
  • Bridge over the Ulagir River
  • Bridge over the Onon River
  • Bridge over the Oka River (City of Kashira)
  • Railway Bridge across the River Chornaya
  • Bridge over the Yauza River
  • Railway Bridges in Adler - "Alpika-Service" Mountain Resort” Route
  • Pedestrian Bridge at Chishmy Station, Kuybyshev Railway Line
  • Pedestrian Bridge at Vologda Station
  • Bridge over the Upa River
  • Bridge over the Optukha River
  • Bridge over the Don River
  • Bridge over the Vetluga River
  • Bridge over the Nerl River
  • Viaduct over the Shiroky Log Canyon
  • Construction of a bridge over the Moscow River and Shmitovsky Way Overpass
  • Dorogomilovsky Bridge over the Moskva River
  • Overpasses at Khoroshevskoe Shosse in Moscow
  • Shcherbakovskaya Street Overpasses
  • Tkatskaya Street Overpasses in Moscow
  • Moscow, Russia
    www.rusmost.ru
    E-mail: usk@skmost.ru
     
    Сopyright © 2007 SK Most. All rights reserved.  
    Developed by ArtDeneb