Bridge rework at the 1096th kilometer of the Kinel – Syzran section, Kuybyshevskaya Railway.
The work started in 2001 and was completed in 2002.
Bridge design: 17.8+3x87.36+17.8 m. Bridge length: 312 m.
All bridge spans have been replaced. The old top polygonal booms were replaced with new parallel-girth span structures.
Non-ballast roadway was installed on the bridge.
Floating systems were used to replace the span structures. All operations were conducted without railway traffic interruption. Traffic was interrupted for no more than 68 hours of "window" time on one track only.