Rework of the bridge over the Tura River at the 257th kilometer of the Egorshino – Ust-Akha section, Sverdlovskaya Railway.
The work started in March 2008 and was completed in 2009.
Bridge design: 23.0+87.6+109.2+87.6+23 m.Bridge length is 342 m.
The design included replacement of the existing spans with new lower-deck span trusses. The wooden bridge sleepers were replaced with non-ballast roadway reinforced concrete slabs in the 0-1 and 4-5 end spans.