Railway Bridge over the Ufa River
Bridge reconstruction at the 1642nd kilometer of the Dema — Kropachevo section, Kuybyshevskaya Railway.
The work started in December 2000 and was completed in 2002.
Bridge design: 3x110 m. Bridge length is 330 m.
The three spans have been replaced as part of the reconstruction work.