Main
Feedback
Map
Русский
     
Main

Video


Страницы: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10
Архив по годам: 2009; 2010; 2011; 2012; 2015;
 
 
Construction of Two Bridges over the Osinovka River Completed on M-60 Ussuri Route. October 25, 2011

Specialists of the SK MOST Group of Companies have completed construction of a bridge crossing over the Osinovka River in Primorie. Two new bridges and over 3 km of a state-of-the art high-seed highway have been built between the city of Ussuriysk and the town of Chernigovka as part of the large-scale upgrading of M-60 federal route.

The new bridges have been already opened for traffic - the event that the Far Eastern motorists have been waiting for during over two decades. This is practically the only section of the entire M-60 Ussuri route between Vladivostok and Khabarovsk that did not have any asphalt pavement.

Construction of two bridges located back to back, a six-span bridge (110-meters long) and a two-span bridge (42-meters ling) at the 619th kilometer of the route has been completed at the point where a tributary merges with the Osinovka River. The bridges are 14-meters wide. The approach route to the bridges has also been fully upgraded: a section that is 3,150-meters long has become a state-of-the-art high-speed highway after the road has been widened and paved with asphalt.

Photo: PrimaMedia
Аndrej Savin / SK MOST

Show all picture stories

Moscow, Russia
www.rusmost.ru
E-mail: usk@skmost.ru
 
Сopyright © 2007 SK Most. All rights reserved.  
Developed by ArtDeneb