Main
Feedback
Map
–усский
     
Main

Video


—траницы: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10
јрхив по годам: 2009; 2010; 2011; 2012; 2015;
 
 
Vykhino Ц Lermontovsky Prospekt Section under Construction Connected to Tagansko-Krasnopresnenskaya Moscow Subway Line. August 16, 2013

The first phase of operations connecting the new tracks to the operating Tagansko-Krasnopresnenskaya subway line has been completed at the Vykhino Ц Lermontovsky Prospekt section under construction. The track in the left interstation tunnel has been connected.

Reconstruction of the existing tracks of Vykhino Station included replacement of the crossing exit and a switch for connecting the main track I of the section that is under construction; the cable lines as well as signals and automatic control and remote control train traffic support systems were installed.

The ramp areas are being finished; a crossing to the right interstation tunnel is under construction, and preparations are underway to connect the track of the right interstation tunnel.

Vadim Skorobogat'ko / SK MOST

Show all picture stories

Moscow, Russia
www.rusmost.ru
E-mail: usk@skmost.ru
 
—opyright © 2007 SK Most. All rights reserved.  
Developed by ArtDeneb